kopo Industrial Manufacturing Backup Power and Continuous Production

paramethara 125KW / 261KWh

Helmets 61 kWh LFP Battery System, 125 kW PCS, EMS and Liquid-Cooling System

Address Congo


Kopa litheko tsa morero

1. Selelekela sa Morero

This project is located in the Democratic Republic of the Congo (DRC) and provides a solar-plus-storage power supply solution for a plastic products factory. The factory mainly manufactures household plastic products and is an important local manufacturing enterprise.

However, the local utility grid is extremely unstable, with frequent power outages causing repeated production line shutdowns. These interruptions have seriously affected the factory’s normal manufacturing operations and its ability to deliver customer orders on time.

To address this power supply challenge, the customer adopted our 261 kWh solar energy storage system. Under normal grid conditions, the solar PV system and energy storage system operate together to supply power to the factory. When the utility grid suddenly fails, the system can seamlessly switch to solar-plus-storage power within milliseconds, ensuring uninterrupted operation of the factory’s equipment 24 hours a day.

This solution has effectively eliminated production interruptions caused by grid outages.

2. Lintlha tsa Morero

Kopo ea 2.1

This project is a typical solar-plus-storage application for an industrial manufacturing facility.

As a continuous-production enterprise, the plastic products factory in the DRC requires an extremely reliable power supply. Conventional diesel generator solutions involve several disadvantages, including high noise levels, serious emissions, high fuel costs, and an unstable fuel supply.

The solar energy storage system enables a greater level of clean-energy self-sufficiency while providing seamless backup power during utility grid outages. This allows the factory to maintain uninterrupted production Lihora tsa 24 ka letsatsi, matsatsi a 7 ka beke.

2.2 Project Configuration

Ntho ea phetolo ga tlhaloso
Lebitso la morero Solar Energy Storage Project for a Plastic Products Factory in the DRC
Bokgoni ba Sisteme 125 kW / 261 kWh
Mofuta oa Polokelo ea Matla Sistimi ea Polokelo ea Matla a Metsi a Fokotseng
Bokhoni ba PV ea Letsatsi 100 kW customer-owned solar PV system
kopo 24-Hour Uninterrupted Power Supply for Factory Operations
Grid Conditions Unstable utility grid with frequent power outages
Ho switjha Method Seamless switching to solar-plus-storage power when the utility grid fails
Equipment Enclosure Company Standard Cabinet

2.3 Thepa e ka Sehloohong

Helmets Mohlala / Tlhaloso
Sistimi ea ho boloka matla a betri 261 kWh Liquid-Cooled Lithium Iron Phosphate Battery System
Sistimi ea Phetoho ea Matla (PCS) 125 kW Bidirectional Power Converter
Solar PV Modules 100 kW Solar PV System
Sistimi ea Taolo ea Matla (EMS) Intelligent Energy Scheduling and Management Platform
Sistimi ea Tsamaiso ea Mocheso Liquid-Cooling Temperature Control Unit
Kabinete e tloaelehileng Company Standard Cabinet with Integrated Power Distribution and Protection

kopo

Industrial Manufacturing Backup Power and Continuous Production

Sheba lithuto
x
Ikopanye Rona - Factop

Re mona ho araba lipotso tsa hau le ho fana ka litharollo tsa matla tse lumellanang hantle le litlhoko tsa hau.

Ka kopo, Khetha Mofuta oa Sehlahisoa
  • Litsamaiso tsa polokelo ea Matla a Indasteri le Khoebo
  • Sebaka sa polokelo ea Matla a Base Station
  • Mekhoa ea ho Boloka Matla a Bolulo
  • Module ea Photovoltaic
  • HJ-HBL Betri
  • Inverter ea polokelo ea matla
  • Sisteme ea Tsamaiso ea Matla
  • Other